Hydro Project - Rongnichu Hydroelectric Project, East Sikkim

Rongnichu Hydroelectric Project, East Sikkim
Client:- Madhya Bharat Power Corporation Ltd.
The Rongnichu Hydroelectric Project (96MW), located in the East District of Sikkim envisages utilizing the flows of the Rongnichu, a tributary of the Teesta River, for the generation of electrical power as a run-of-river hydropower development.
- Barrage - 16.00M High above River bed level.
- HRT - 12.58 KM long.
- Surge Shaft - 88M deep,10.00 M finished Dia.
- Adits (0,1,2,28 & 3) - 1860.47 m.
- Vertical Shaft - 318M Deep, 4 M finished Dia.
- Lower Horizontal pressure shaft - 975M Long.
- Upper Horizontal pressure shaft - 160.80M long.