Daspalla - New BG Rail Link Project

Construction of Tunnel T1 (800 m length, Ch. Km. 106.825 to km. 107.625), Tunnel T2 (1775 m length, Ch. Km. 108.225 to Km. 110.000) & Tunnel T3 (2620m length, Ch. Km. 126.420 to Km. 129.040) including Bolt grouting & Plate fixing for OHE and other allied works between Daspalla & Baniguchha of Khurda Road-Bolangir New BG Rail Link Project on EPC mode.

Salient Features

  • Length of Tunnel:- T1-800 Mtrs, T2-1775 Mtrs, T3-2620 Mtrs (TOTAL-5195 Mtrs)
  • Shape of Tunnel:- Horse Shoe

Connect Us

  • Sriram Business Park, Shop No. 3/4, Block – I, Vidhan Sabha Road, In-Front MGM EYE Hospital, Raipur (C.G) Pin – 492014
  • +91 83495 66401
  • +91 98933 09754
  • civil@mvil.co.in

Privacy Preference Center