Igatpuri - Rehabilitation of Railway Tunnels Project

Kasara-Igatpuri -(A)Strengthening of tunnel No.4B and 4C (B)Kasara-Igatpuri – Strengthening of Tunnel No. 5B, and 6AB,6C (C) Kasara-Igatpuri – Provision of side drain and side drain cum protection wall along the tunnel portal of Tunnel No. 1AB, 7BC, 7A and 5C. (D) KSRA-IGP – Strengthening of masonry earth retaining walls in Tunnelsapproaches, cutting & bridge abutments walls at km 134/00-135/60 MID under ADEN(M)IGP. (E) Kasara-Igatpuri -Construction of retaining wall along the MID line from km135/900-134/00.

Salient Features

  • Strengthening of Tunnels:- Tunnel No.4B,4C,5b,6A,6B,6C,1A,1B,7A,7B,7C
  • Works:- Rockbolting,Shotcreting,Grouting,False Portal,Retaining Walls and Side Drains etc.