RONGNICHU HYDROELECTRIC PROJECT, EAST SIKKIM

 Client:- Madhya Bharat Power Corporation Ltd.

The Rongni Chu Hydro-Electric Project (96 MW), located in East District of Sikkim envisages to utilize the flows of the Rongni Chu, a tributary of the Teesta River, for the generation of electrical power as a run-of-river hydropower development.

Salient Features of the Rongni Chu Hydro-Electric Project

1) Adits(0,1,2,2B&3):  1860.47 m.

2) HRT : 12.58 KM long,4.00M finished Dia, D- shape.

3) Surge Shaft: 88M deep,10.00M finished Dia

4) Barrage : 16.00M High above River bed level

5) Vertical Shaft: 318M Deep ,3.00M finished  Dia.

6) Lower Horizontal pressure shaft : 957M long.

7) Upper Horizontal pressure shaft: 160.80M long.

8) Power House : Surface Power House

9) Turbines: Pelton , Vertical Shaft.

10) Generating Units: 2*48MW.

11) Transmission line: 7.45Km long 220KV DC line from Kumrek to Samardung(Rangpo) of PGCIL and then from Rangpo via Melli to National grid(Eastern,Northern and Western grids).

 RONGNICHU HYDROELECTRIC PROJECT, EAST SIKKIM
 RONGNICHU HYDROELECTRIC PROJECT, EAST SIKKIM
 RONGNICHU HYDROELECTRIC PROJECT, EAST SIKKIM
 RONGNICHU HYDROELECTRIC PROJECT, EAST SIKKIM
 RONGNICHU HYDROELECTRIC PROJECT, EAST SIKKIM
 RONGNICHU HYDROELECTRIC PROJECT, EAST SIKKIM

Client With Us