Hydro Project - Gullu Hydroelectric Project (C.G)
Client: – Chhattisgarh Hydro Power LLP.
The The Gullu HE project, located in the North-East part of Chhattisgarh, in the Jashpur district is planned as a run-of-river development using the power potential of the IB River, a tributary of the Mahanadi river.
Salient Features
- Barrage: 11.00M High above River bed level
- HRT: 5.137 KM long
- Surge Shaft: 40 M deep
- Penstock: 617m long
- Upper Horizontal pressure shaft: 160.80M long.
- Generating Units: 2*12MW





